Webmaster's Biller Layout - all mine |
|
I'm very proud to present a Biller Layout which I recently bought. So this is nothing which really derived
from my thoughts - but could have.
Anyway this layout found an adequate home.
The two modules were built by a professional layout
constructor in 2000 - and was already displayed at an exhibition of the
Wuppertal Town Services. The seize is currently 4,35 x 0,53 m - and may be (and will be) extended
a little.
A really good job done - displaying
a log loading area, a peat bog and a quarry. There is also a "holding
point Mooreck" - no really station - and a turning point. Craftsmen have
been removed since they weren't to scale and found another job on previous
owners Gauge I layout. So something is missing.
But see yourself - enjoy.
|
|
|
|
|
|
overview |
view over the log section towards the peat
bog |
from peat bog to quarry |
heading towards quarry |
|
|
|
|
|
from left to right towards the quarry - looks
like lunch break |
|
|
|
|
|
mountain's still there |
holding point "Mooreck"
and turn-around |
enroute |
passing again the quarry
... |
|
|
|
|
|
... towards the peat bog |
lunchtime at the peat bog as well |
|
|
|
|
|
break - but the peat is ready to be loaded |
the "oiler" |
log loading section |
|
Since mid of December 2005 the above shown diorama was
extended. SO here we have some pictures of this right side extension. |
|
|
|
|
the "old" layout in the background |
in the foreground - the "new" right side extension |
loading area - 0e Biller to O-Faller track |
side view |
|
|
|
|
|
EfZet floor runner and Bing-coach |
tippers have unloaded |
Bing - approx. 1930 |
bumper at the 0-track |
|
|
|
|
|
Entrance to the wood - and gravel terminal |
break |
013 and gondolas - waiting for new order |
on the way back to the quarry at the track-triangle |
|
|
|
|
|
new load for ... |
... the log storage |
MAN - tractor in between |
workers hut |
|
Despite originally intended to start the completion of this
diorama in 2005 / 2006 - the time has come just some 12 years later (as some
major infrastructural project in Germany take even longer to get started or
completed!) to go ahead. After completion the layout will
be either "U"-shaped with a seize of 4,94 x 2,10 meters (16.2 x
6.89 feet) or "L"-shaped with a seize of then 6,70 x 2,10 meters (21,98 x
6.89 feet). In order to enable circular traffic on either the "L"- or
"U"-shaped layout I decided to create 2 individual track crossings. Took me
a while to get to this solution - but it works perfect.
|
|
|
|
|
both possible layouts as .pdf / not to scale |
Overview of the left side with Transition points to the adjacent part, Control Posts and Station... |
...and the right side, incl. small Station (Schumann), Pedestrian Bridge
(Beckh) and Depot
with Engine Shed |
individual track cross-over |
|
|
|
|
|
with the corresponding HWN control post |
Kibri HO control and signal bridge - not to scale but cute! |
small version of a 0-Gauge Schumann Station - to be
replaced by the large version of this model. |
Details between Station and Depot |
|
Since February 2018 part No.
4 is finally completed. It took me just 12 year to get done - but at least
faster than building a new Capitol Airport in Berlin or the main Train
Station in Stuttgart! The last part shows some
equipment which was not made by Biller but is typical for that era - some
not to scale but cute, e.g. the station was made by Adolph Schumann
(pre-war), the Control Post made by HWN, Signalbridge by KIBRI, Footbridge
and wooden barrels in the Depot by BECKH, Animals by PLAHO (former GDR)
and the cars mainly from nowadays Penny Toy Producers made in China. Don't
care - cute and typical of the time.
|
|
|
|
|
brick laying complete - 3950 pieces of brick |
gates made from Zoo-fences |
privacy-protection to prevent spying |
in the middle |
|
|
|
|
|
leaving the station - going enroute |
real wildlife |
depot - SHELL-barrels by Biller, wooden barrels by BECKH - self-made coal
bunker to
operate the remaining steam locos |
refilled and maintained - ready for departure |
|
|
|
|
|
transition to the 3rd part of the Diorama - from both sides |
Tail section - as well from both sides |
|
generated:
APR-25-2004 |
last update: Spring 2018 |